In order to implement the “13th Five-Year Plan” for renewable energy development, optimize the construction of renewable energy power, scientifically grasp the rhythm of renewable energy development, and strengthen target guidance and planning guidance, the Office is studying and improving the renewable energy source based on planning. Annual construction scale management mechanism. You are now requested to submit relevant materials and related recommendations for the “13th Five-Year Plan” for renewable energy (including wind power, photovoltaic power generation, biomass power generation, and non-hydrous electricity). The specific requirements are as follows:
1. The energy authorities of all provinces (autonomous regions and municipalities) shall submit the “13th Five-Year Plan” for energy development issued by the National Development and Reform Commission and the National Energy Administration, and the 13th Five-Year Plan for the Development of Renewable Energy. Renewable energy “13th Five-Year” development plan annual construction scale plan notice plan and other related plans, as well as the “13th Five-Year Plan” for energy development approved by the National Energy Administration, and the “13th Five-Year Plan” for renewable energy development in the region Based on this, the plan for the scale of renewable energy power construction, which is decomposed into the years from 2017 to 2020, is proposed, including the new construction scale, construction type and construction layout of each year.
2. The competent energy departments of all provinces (autonomous regions and municipalities) shall take the implementation of power transmission and consumption as the basic prerequisites for arranging the scale and layout of new renewable energy power generation in the region, and make a five-year plan and annual construction scale. The convergence of the plan, with the one-off annual construction scale plan as the work basis, when the new construction scale is implemented in each year, the relevant grid enterprises are invited to conduct research on the annual new construction scale connection conditions and consumption plans. And ask the grid companies to issue power transmission and consumption opinions.
Third, wind power should balance the construction scale with the matching relationship between power transmission and consumption. According to the requirements of the 13th Five-Year Plan for Wind Power Development, the scale of wind power integration in the central and eastern regions is not lower than the grid-connected scale proposed in the plan. The provinces (autonomous regions and municipalities) that have not reached the guaranteed utilization hours shall not be set higher than the grid-connected scale proposed in the plan. The corresponding construction scale should be considered in consideration of the scale of the annual construction and the construction scale of the UHV delivery base. The total scale of wind power configuration of each high-voltage external delivery base can be configured according to the maximum capacity of the line to deliver wind power.
4. Photovoltaic power generation shall be in accordance with the grid-connected scale proposed in the "13th Five-Year Plan for Solar Energy Development", combined with the regional energy planning and photovoltaic power generation planning, respectively, to identify the centralized (photovoltaic power plants) of the province (region, city) in each year. New scale of construction of distributed photovoltaics. In principle, the newly-built construction scale of each province (autonomous region, municipality) should maintain a stable and orderly development. The corresponding construction scale should be considered in consideration of the scale of construction that has been issued in the previous period. The scale of photovoltaic leading base, photovoltaic poverty alleviation and UHV delivery base. In addition to the special high-voltage delivery base that mainly supplies solar power, in principle, the total scale of photovoltaic power generation configuration of each UHV delivery base does not exceed 2 million kilowatts.
5. Biomass power generation (mainly including agricultural and forestry biomass power generation and waste incineration power generation) shall be in accordance with the Notice of the General Affairs Department of the National Energy Administration on the preparation and reporting of the implementation plan for the construction of the 13th Five-Year Biomass Power Generation Project (Guo Neng (2017) No. 180), report the implementation plan of biomass power generation as soon as possible. If the conditions can be decomposed into each year and cannot be included in the accurate year, the construction scale and project layout during the “13th Five-Year Plan” period can be listed.
6. All kinds of distributed photovoltaic power generation, decentralized wind power and biogas power generation are not subject to the annual new construction scale limit in each region. The provinces (autonomous regions and municipalities) shall list the expected construction scale of distributed photovoltaic, decentralized wind power and biogas power generation in the annual construction scale plan of the region, which may be higher than the expected scale in the original construction plan. In addition to the type of construction that is not limited to my size, once the other types are determined to increase the scale of construction, the provinces (autonomous regions and municipalities) must not over-scale the construction projects. If excessive scale construction occurs, the responsibility for solving the subsidy funds will be exceeded. .
7. The wind power and photovoltaic power generation bases for the extra-high voltage power transmission channels of the provinces (autonomous regions and municipalities) shall be separately configured according to the planning, approval time and construction period of the UHV channel, but shall be included in the “Ten of the province (autonomous region, municipality)”. The total scale of the “three-five” plan will span the UHV bases built by the “13th Five-Year Plan” and “14th Five-Year Plan”. Photovoltaic power generation can be arranged in 2020. Wind power can be arranged in 2019 and 2020.
The above materials should be submitted to the National Energy Administration (New Energy Division) in official documents before May 18.